http://www.invest.gov.tr/en-US/investmentguide/investorsguide/Pages/BusinessPremises.aspx
Minimum Monthly Wage (gross and net) | |
USD | |
Net Minimum Wage | 382.02 |
Gross Minimum Wage | 483.62 |
|
67.69 |
|
4.83 |
|
25.39 |
|
36.27 |
|
3.67 |
Total Deduction | 101.60 |
Employer Cost | |
|
483.62 |
|
74.96 |
|
9.67 |
Total Employer Cost | 568.26 |
* Calculation of income tax is [(483.62 – 67.69 – 4.83) x 0.15] – 36.27 = 25.39
** For single individuals without children and may vary according to marital status and number of children. *** For premiums that are paid in due time, as an incentive, a five-point reduction is applied (down from 20.5% to 15.5%). Source: Ministry of Family and Labor Valid for January 1, 2019 – December 31, 2019 USD 1 = TRY 5.29, as of January 2019 |
Cost of Electricity | ||||||||||
Consumers Purchasing Electricity from Commissioned Supply Companies | ||||||||||
Distribution System Users | Capacity | Active Energy + Distribution | Reactive Energy | |||||||
Capacity Charge | Over-Capacity Charge | Standard | Daytime | Peak | Nighttime | |||||
TRYcent/kWh | TRYcent /kWh | TRYcent /kWh | TRYcent /kWh | TRYcent /kWh | TRYcent/kWh | TRYcent/kWh | ||||
Medium Voltage | ||||||||||
Double Term | ||||||||||
Industry | 256.8597 | 513.7194 | 44.0625 | 44.5715 | 68.9052 | 24.9319 | 22.2020 | |||
Single Term | ||||||||||
Industry | N/A | N/A | 44.7785 | 45.2876 | 69.6214 | 25.6479 | 22.2020 | |||
Low Voltage | ||||||||||
Single Term | ||||||||||
Industry | N/A | N/A | 49.7121 | 50.2210 | 74.5548 | 30.5814 | 22.2020 | |||
System Usage Tariffs for Consumers Purchasing Electricity from Private Suppliers* | ||||||||||
Capacity | Distribution Tariff | Reactive Energy | ||||||||
Capacity Charge | Over-Capacity Charge | |||||||||
TRYcent/kWh | TRYcent/kWh | TRYcent/kWh | TRYcent/kWh | |||||||
Medium Voltage | ||||||||||
Double Term | ||||||||||
Industry | 256.8597 | 513.7194 | 6.8024 | 22.2020 | ||||||
Single Term | ||||||||||
Industry | N/A | N/A | 7.5139 | 22.2020 | ||||||
Low Voltage | ||||||||||
Single Term | ||||||||||
Industry | N/A | N/A | 11.6255 | 22.2020 | ||||||
Multiple tariff application for November-March period: 07.00-18.00 daytime; 18.00-22.00 peak; 22.00-07.00 nighttime.
Multiple Tariff application for April-October period: 06.00-17.00 daytime, 17.00-22.00 peak; 22.00-06.00 nighttime Capacity Charge: Monthly fixed-fee calculated per kW based on the “contract power” specified in connection contract and charged to double-term consumers connected to distribution system Over-Capacity Charge: monthly fee calculated per kW for amount of power exceeding the “contracted power” specified in the connection contract and charged to double-term consumers connected to distribution system Double-Term tariff: Tariff class charged for “distribution fee over the amount of active energy flow (kWh) received from the distribution system or given to the distribution system”, plus capacity-charge calculated per kW specified in the connection contract, plus over-capacity charge for the power (in kW) exceeding the “contract power.” Single-term Tariff: The tariff class charged for distribution fee only through the amount of active energy flow (kWh) received from the distribution system or given to the distribution system. *The active energy price is not reflected in the table, as the price is determined bilaterally between the consumer and the supplier. Source: Energy Market Regulatory Authority (EMRA) |
||||||||||
Cost of Water for Industrial Use | ||||
Reference Price USD/m3 | ||||
Type of Customer | Water | Waste Water | Water VAT (%) | |
Industry | 2.17 | Included | 8 | |
Reference Price USD/m3 | ||||
Organized
Industrial Zones (OIZs) |
Water | Water VAT (%) | Waste Water | Waste
Water VAT (%) |
Eskişehir OIZ | 0.12 | 8 | 0.12 | 8 |
Antalya OIZ | 0.9 | 8 | – | – |
Source: Istanbul Water and Sewerage Administration (ISKI)
Eskişehir Water and Sewerage Administration & Antalya Water and Sewerage Administration USD 1 = TRY 5.29 as of January 2019 |
Cost of Natural Gas* | ||
Gas Sales Tariff for Customers
that have a Signed a Gas Sales Agreement with BOTAS |
||
USD/kWh | USD/Sm³ | |
Less than 300.000 Sm³ | 0.016 | 0.168 |
OIZ | 0.022 | 0.254 |
More than 300.001 Sm³ | 0.022 | 0.255 |
Source: Petroleum Pipeline Corporation (BOTAS)
* Excluding SCT and VAT USD 1 = TRY 5.29 as of January 2019 |
Cost of Broadband Services | |
Fibernet and Hypernet | (USD/month) |
Download Speed (Mbps) – unlimited tariffs | Price |
Up to 24 | 51 |
Up to 35 | 60 |
Up to 50 | 75 |
Up to 100 | 104 |
Up to 1000 | 165 |
Metro Ethernet and G.SHDSL | Requirement specific |
Source: TTNET, Superonline